Complete the Site Survey below to take one step closer to being connected to the fastest fiber around.
Before you get started, here are some things to keep in mind:
- Note possible obstructions around the premise such as trees, decks, landscaping, buried gas lines, septic systems, underground electric cables, drain tiles, waterlines, etc.
- Keep in mind, a Network Interface Device (NID) will be installed on the building’s exterior (3′-5′ above ground level), which acts as the connection point between buried facilities and premise wiring, similar to your electric meter box. Therefore, your proposed bury route needs to connect to a point on the exterior where the NID can be affixed properly and is on a wall that can be penetrated to run a wire from the NID to the ONT (typically installed in the basement or utility room).
- The NID cannot be located on decks or areas above concrete sidewalks where there is not green space directly below it.
- Need help? Check out our tutorial.